2021

WMS CLASS SYSTEM
Implementation of a new WMS class system by Quantum Qguar ® at Paul Schockemoehle Logistics Polska

2019

TMS CLASS SYSTEM
Introduction of a new LIS Winsped® TMS system at Paul Schockemoehle Logistics Polska

2018

OPENING OF THE WAREHOUSE IN KRAPKOWICE
Opening of a new warehouse with an area of 8,000 sq m in Krapkowice

2018

BRANCH IN BYDGOSZCZ
Opening on 02-01-2018 of the branch of Paul Schockemoehle Logistics Polska in Bydgoszcz

2017

A NEW LOGISTICS WAREHOUSE
Beginning of the construction of another logistic warehouse with an area of 8,000 sq m in Krapkowice

2016

A NEW ADMINISTRATIVE BUILDING
A new administrative building was added to the office building in Mühlen.

2015

DL WUPPERTAL
Moving logistics of tires from Duisburg to Wuppertal. Thanks to a better route (BAB 46) even faster and more flexible operation has become possible for us.

2014

PSL VECHTA
Creation of additional warehouse space in Vechta and Bakum. Thanks to this, it was possible to extend the production capacity in the area of display construction and beverage logistics.

2013

EXPANSION OF THE LOGISTICS CENTER IN KRAPKOWICE
Enlargement of the current warehouse to 8,000 sqm

2013

PSL VECHTA
Acquiring the leader of the beverage market and establishing PSL Vechta GmbH with the aim of direct care and implementation of the entire beverage logistics.

2013

LOGISTICS CENTER IN STEINFELD
Opening of a new logistics center with focus on automated cleaning of production and creation of additional production capacities.

2012

CENTRALIZATION OF LOGISTICS OF BUILDING MATERIALS
Centralization of logistics of building materials in our location in Neustadt-Glewe. From here, the entire transport of building materials is coordinated with open cranes and forklifts.

Pages